Project Details

Structural Integrity Reserve Study
Clearwater, Florida

CLIENT
Clearwater Point 8

OVERVIEW
Size – 2 building multifamily residence with 136 units total
Stories – 9 stories
Material – The structural systems were consistent with a Pier/Beam foundation with Concrete Masonry Units (CMU) walls clad in Stucco veneer. The observable roof structure was consistent with a predominantly Flat roof design covered with Modified Bitumen.

PROJECT DESCRIPTION
Services provided included:

Structural Integrity Reserve Study and Milestone Inspection.

< Back to Projects

Certified Master Inspector home inspector structural engineer construction tampa florida
certified professional inspector
internachi certified structure & foundation inspector
repair verification internachi certified
internachi certified new construction inspector
internachi certified moisture intrusion inspector
green building inspector internachi certified
internal association of certified home inspectors
exterior inspector internachi certified
crawlspace inspector internachi certified
deck inspector internachi certified
crawlspace inspector internachi certified